![]() In the event of any inconsistencies between the shapefiles and the CUSC, the TNUoS tariff reports or the NGESO Use of System Charging Statements, then the CUSC, the TNUoS tariff reports or the NGESO Use of System Charging Statements will take precedence. That said, they are a good indication of the geography of TNUoS generation zones. ![]() The boundaries are indicative and come with the disclaimer that they are not 100% accurate. Once we identify an existing substation that is the closest neighbour to the new substation (the “distance” is measured by site-specific incremental MWkm), the boundary is, theoretically, re-drawn to ensure that the new substation falls into the same generation zone that contains its nearest neighbouring substation. OpenStreetMap is a map of the world, created. In addition, the boundaries tend to flex over time when a new substation is added close to a boundary. National Grid PLC: power: substation: substation: transmission: voltage: 400000 275000 132000: Part of 6 relations. The total number of TNUoS generation zones may change over time. There are 27 TNUoS generation zones, and each is associated with a set of generation zonal tariffs. This dataset contains approximate GIS (geographic information system) geospatial boundaries for each of the TNUoS generation zones in Great Britain.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |